
Operating & Procedure Suites
Terminal cleans and between-case protocols built to the standard your infection control team expects. Every single visit, fully documented.
0%
Visits documented
<30min
Turnaround target
EPA
Approved chemistry
0h
Direct-line response
What's included in every OR clean
Whether it's a between-case turnover or a full end-of-day terminal clean, our technicians follow the same documented protocol. Nothing abbreviated, nothing assumed.
A rapid, structured clean between cases. Surfaces, equipment, and floors returned to standard within documented time windows.
A full room reset: floor-to-ceiling disinfection covering lights, vents, high-touch surfaces, and equipment per the OR checklist.
Only EPA-registered, equipment-safe disinfectants matched to your IP team's approved list, with contact-time compliance built in.
Documented. Every time.
Written attestation available on demand for every visit.
Deliverables on every visit
- Signed service report with scope completed
- Problem sheet flagging any non-cleaning issues
- Chemistry and contact time log
- Direct line open for same-day questions
- Audit-ready records on 24h request
How a terminal OR clean runs
Six structured phases. Each one documented before moving to the next.
01
Pre-Clean SetupPPE donned per protocol, supplies staged, checklist reviewed. Nothing enters or exits without documentation.
02
High-Touch Surfaces FirstHandles, rails, controls, and anesthesia carts disinfected before anything else.
03
Surgical Field & TableThe operative table and immediate field cleaned with approved chemistry. Contact times observed and logged.
04
Walls, Vents & LightsTerminal cleans include overhead lights, walls, and HVAC diffusers: the areas skipped by non-specialized teams.
05
Floor DisinfectionWet mopping, two-bucket or single-use per IC policy. Corners and under-equipment zones included.
06
Sign-Off & ReportService report completed, problem-sheet items logged, room cleared. Filed within 30 minutes.
Our crew, mid-terminal-clean
Documentation decision-makers can stand behind
When a surveyor asks about your EVS program, you hand them a folder, not a phone number.
- Service ReportsAfter every visit: scope, timestamp, technician, and areas covered
- Problem SheetsA separate log for maintenance, physical plant, and compliance observations
- Audit-Ready ArchiveRetrievable within 24 hours, organized by date, area, and service type
Survey-Ready Status
When Joint Commission calls, your EVS documentation is already compiled, dated, and signed. No scrambling required.
Other service areas
Daily and discharge cleaning, ready for the next admission without delay.
Learn moreICU, NICU, oncology, and dialysis with unit-specific protocols.
Learn moreDocumentation and problem-flagging that keeps you audit-ready.
Learn moreReady to discuss your OR program?
Tell us about your facility and volume. We respond within 24 hours with a direct conversation, not a brochure.